Maintained by West Coast Expressway (WCE) Sdn Bhd
(formerly known as Konsortium Lebuhraya Pantai Barat (KPLB) Sdn Bhd)
[[Image:Template:Location map+|290x172px]]
Length: 233 Template:Infobox road/length link/km (Template:Rnd {{Infobox road/length link/Template:Infobox road/length toggle/km}})
Formed: 2008
History: Completion schedule for 2018
North end: Changkat Jering, Perak
Major
junctions:
----

Exit 1888 Template:AHN-AH North-South Expressway Northern Route
'Bold text' Federal route 60
'Bold text' Federal route 5
'Bold text' Ipoh-Lumut Highway
'Bold text' Federal route 58


Exit 1888 Kuala Lumpur-Kuala Selangor Expressway
'Bold text'


Exit 1888 North Klang Straits Bypass
'Bold text' Federal Highway


Exit 1888 Shah Alam Expressway


Exit 1888 South Klang Valley Expressway
Jalan Banting-Dengkil
Nilai-KLIA Highway

South end: Banting, Selangor
Template:Infobox road/MYS mainTemplate:Infobox road/MYS browseTemplate:Infobox road/MYS links

The West Coast Expressway, WCE or (Template:Lang-ms) (LPB),


Exit 1888 (E32) is a planned expressway that will be built on the west coast of Peninsula Malaysia. It will connect Taiping, Perak to Banting in Selangor. The expressway will be built by Konsortium Lebuhraya Pantai Barat (KLPB) soon, as approval has just been given by the government for the construction to begin.

Overview[]

Construction of the expressway will be divided into eleven packages. Works for the first five packages will commence in April 2014 of which three packages are in Selangor while the other two in Perak. The stretch between Tanjung Karang to Hutan Melintang and Teluk Intan to Kampung Lekir will be on the existing stretch of Federal route 'Bold text' meanwhile the stretch between Parit to Siputeh will be on the existing stretch of Federal route 'Bold text' which both will be upgraded as part of the expressway. The expressway will have a closed toll system like North-South Expressway.

The highway will cost about RM 4.6 billion, where RM3.6 billion will be construction costs. The concessionaire company is planning to issue bonds in 2009.Template:Update after Construction has been delayed to 2009 because of changes in alignment and costing. It is expected to complete in 2012.Template:Update after[1]

On 12 November 2008, the project was shelved as terms of the current deal could not be finalized within a 15-month time frame. A new tender have to be open out.[2]

On 26 January 2012, Europlus Group Bhd officially obtain the MYR 7.07 billion tender to build the highway from the government. The highway will have a total length of 316 km, where 92 km will be toll free. The highway will be built on the build-operate-transfer concept with a concession period of 60 years.[3]

Route background[]

The Kilometer Zero of the expressway is said to be located after the border limit of


Exit 1888 Changkat Jering Interchange on the North South Expressway Northern Route. However, it is yet unknown where it will be located.

Features[]

Notable Features[]

Template:-

Overlaps[]

  • Tanjung Karang-Hutan Melintang : 'Bold text' Federal Route 5
  • Teluk Intan-Kampung Lekir : 'Bold text' Federal Route 5
  • Parit-Siputih : 'Bold text' Jalan Siputeh-Batu Hampar

Alternate routes[]

  • Beruas-Taiping South Interchange : 'Bold text' Federal Route 60

Section with motorcycle lanes[]

Template:-

References[]

Template:Reflist Template:Malaysian Expressway System Template:Highways of the Malaysian Federal Route 5

External links[]

  1. Template:Cite news
  2. Template:Cite news
  3. Template:Cite web